Team Member :
2) Chan Kam Seng ( Interior Design )
3) Cheah Wai Kin ( Building Technology )
4) Ma Feng Yi ( Planning )
- did come with knowledge which gained by listening to the orders and requirements of lecturer, seeing the examples given on website, and differentiating the required dome we need to build.
- geodesic
- zero cost
- packaged and prefabricated
- accomodate 5 persons and is carryable by 3 persons
- constructed by own team members only
- showing team identity
- constructed within 30 minutes started from 11:30am till 12pm on 10 September 2008
- its lifespan must be less than 12 months
- independent and not linked to other domes
- The materials using in the construction should be recyclable
Team members should formed by at least one from a different major.

Act :
With the reference of geodesic dome calculator during researching and group discussion, we have decided to construct a 2V geodesic dome with radius = 1.8 meters using the following recyclable materials:
- Bamboo as framework (could be recycled into the forms of beautiful furniture such as bamboo photo frame, bamboo-bath-set, bamboo flooring, bamboo glass, bamboo fence and so on) - cut from the bamboo site near the USM sport storeroom.
- Plastic rope as connector (could be recycled for binding, tying and furniture)
- Black plastic bags as dome's coat (could be recycled as garbage bags and other domestic usages). - donated and sponsored by seniors and kind villagers.
*Zero cost and recyclable materials. Checked!
Firstly, we cut the bamboo sticks into smaller parts by ourselves and using the specified measurement calculated by the dome calculator.
After that, we drill a small hole at each side of the small bamboo sticks to allow the plastic rope as connector with other sticks through the small holes.
* The dome can accomodate 5 persons. Checked!
On the Domes Day, our team did work hard to erect the dome planned on the correct site in the given time right after the team photo registration.
Source of picture: http://www.hbp.usm.my/1b/RAG132/2008/domeregist.htm
* The prefabricated dome packages are carryable by 3 persons. Checked!
*An independent dome is constructed by own team members. Checked!






3. Building:
4. Premise:
5. Urban:
6. Regional:
7. Global: Different perspective of looking at it such as 



- people involved in the process of production.
- natural and man-made.
- built environment must be on earth.